HOCKEY: Fran Long claimed four goals as Stourport swamped Camp Hill 8-1 in Worcestershire League Division One on Saturday.
Kerry Walker scored the first of her two goals after just 10 minutes and Louise Bagnall added Stourport's second soon after.
Stourport led 4-0 by half-time and the outcome of the match was in no doubt.
Long's four included a second-period hat-trick and Melissa Kennedy added a single strike.
Cresconians 3 Stourport 2nds 2
Despite taking a two-goal lead inside the first six minutes, Stourport lost in Division Two to a last-gasp strike.
Karen McIntyre and Emily McCoy scored from short corners but Cresconians replied with goals in the 30th and 55th minutes before snatching the winner.
Stourport 3rds 3 Droitwich 0
The thirds have now won their opening two Division Three fixtures.
They took their chances with a double from Karra Sunburk and one from Jean Senior.
Fixtures, Saturday: Stourport 1sts v Tenbury (2pm), Upton v 2nds at Malvern (12.30pm), 3rds v Pershore (12.30pm), 4ths v Lichfield (5pm).
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereComments are closed on this article